Get Permits and Lead Times – in Seconds vs Hours.

With Feasibility-IQ, you can instantly identify all required overflight and landing permits, along with lead times, for any route – reducing hours of work to seconds.

How It Works

WHAT FLIGHT DEPARTMENTS ARE SAYING

“It’s like having a trip support expert with me to answer any question that my passengers or I have about a location – like entry requirements, operating procedures, ground intel, estimated turn times, and more. It’s a real time-saver on international missions.”

Part-91 Captain

TRY IT YOURSELF

Sign up for a 30-day FREE trial

Free Trial »

Effortlessly Navigate All Permit Requirements and Lead Times

Input Your Flight Details

Select your aircraft registry and input your FAR type, departure and arrival airports, and departure date.

Just Add a Route

Add your own route from your flight planning system or select from multiple options available, including pre-built routes by Universal, optimized for best winds, and direct airport-to-airport routes for your ICAO pair.

Get Comprehensive Permit Insights

Feasibility-IQ will quickly identify all FIRs, entry/exit points, and required overflight and landing permits, including lead times and average confirmation times prior to operations.

Drill down into Permit Details

View all required permits for full details, including official CAA lead times based on your FAR type.

Access how-to guides and more by visiting the uvGO Knowledge Base

WHAT FLIGHT DEPARTMENTS ARE SAYING

“I used to spend hours researching new international trip requests. But now, with Feasibility-IQ, I can search up multiple destinations at once and get all the information I need fast. It’s a game-changer for what I do.”

Part-91 Scheduler

TRY IT YOURSELF

Sign up for a 30-day FREE trial

Free Trial »

    Operational Insight

    G20 2024 Summit in Rio de Janeiro: Business Aviation Guide

    on November 8, 2024

    With Rio's G20 Summit just weeks away (November 18-19, 2024), business aviation operators face significant operational challenges at SBGL. Get […]

    READ ARTICLE

    eu-LISA Phase 1 Postponed until Spring 2025

    on November 7, 2024

    On Feb. 17, eu-LISA issued this notice urging operators to register with the agency ASAP if they plan to transport passengers into the EU, starting […]

    READ ARTICLE

    United Kingdom Advance Passenger Duty (UK-APD): Business...

    on October 31, 2024

    UK-APD (Advance Passenger Duty) is a per-passenger duty that must be paid to HM Revenue & Customs (HMRC) for qualifying business aircraft […]

    READ ARTICLE